From the inside looking South, here's the last side of the foundation all tied in to the rest of the concrete. Soon there will be a concrete floor over the crushed stone.
We've had torrential rain (again) these past few days. The rain washed out a section of the wall excavated for the foundation. Mud poured over the new footing, but there's no serious damage. In this shot, we've covered the dirt with tarps to channel the water away.